RFQ for 5I HDB resale unit 转售组屋装修计划报价单
国大大叔 • • 48632 次浏览This RFQ (Request For Quotation) is for a renovation project for a resale HDB unit, 5 Room Improved. This HDB unit is located at Bedok.Key collection is scheduled on either 31st of May or 23rd of June.This renovation project is expected to be completed within 25 calendar days.Quotation is expected to be itemized with unit price, dimension and detail of the raw material.Past completed project will definitely be a plus in the consideration of the award of this RFQ. In such cases, please attach photos of past completed project in corresponds to each item.3D design or hand drafted completion drawing of this project is not mandatory, but will be a plus point.Please submit the furnished quotation to [email protected] by 4th of May, 2016This RFQ is initiated by the owner of the HDB unit and all corresponds will be reached out directly to the owner through the listed email address.For clarification, the owner could be contacted via email, phone or in person upon request.================1. DEBRISa. Disposal of renovation debris2. CARPENTRYa. Living Room: Full height shoe cabinet by the gate, replacing the original store room doorb. Master Bedroom: Full height L shaped wardrobe with hidden door to the master toiletc. Bedroom One: Full height wardrobed. Balcony: Full height book cabinet with cover, top half glass door and bottom half wooden door3. PAINTINGa. Paint the whole flat with Nippon4. MIRRORa. Full height mirror at dining hall, by the kitchen door (with wooden backing and aluminum frame)5. OTHERSa. Foldable door between kitchen and dining hallb. Grind and polish existing marble floor (living room, bedrooms and balcony)c. Cardboard for floor protectiond. Acid washing6. OPTIONALa. Replace four existing wooden doorsb. Replace existing metal gate
请在五月四日之前呈交装修计划报价单至[email protected]。请在报价单内注明详细的分项价格、单价、尺寸以及所使用的原材料。这份报价单是针对HDB转售五房组屋,该组屋位于勿落。开工日期暂定五月三十一日或者六月二十三日,工期为二十五天。优先考虑有类似装修经验的报价单。如有,请将往日的装修实物照片一同呈交。整个采纳、考量、交易的过程皆由屋主亲自完成,不涉及其他个人,公司或中间商。如有需要,可以要求以电话、电邮或者面谈的方式联系屋主。================1. 装修垃圾a. 清除装修垃圾2. 木工a. 客厅:落地鞋柜(位于正门后),拆除现有储藏室木门,在鞋柜同平面安装新木门。b. 主卧:落地L型衣橱,留有通往主卫的暗门c. 客卧一:落地衣橱d. 阳台:落地书橱,上半玻璃门,下半木门。3. 油漆a. 整间油漆4. 镜子a. 落地镜,餐厅整墙5. 其他a. 厨房和餐厅之间做折叠门b. 打磨现有大理石地面(客厅、卧室和阳台)c. 纸皮d. 酸洗6. 有可能a. 更换四扇木门b. 更换铁门

-
#1
吐槽一下这个房子开门的位置都好奇怪